Technology

Power Management Facilities
  DC1 DC2
Municipal Vendor: CenterPoint Pull: 6000 Amps over to 2 Transformers Service level: Critical Customer - similar to Hospital Service level Vendor: CenterPoint Pull: 3000 Amps over to 1 Transformer Service level: Critical Customer - similar to Hospital Service level
Generators Generator 1
Power Plant: 16 Cylinder 3000 horse power Cummins Marine
Grade Diesel Gen Set:ONAN
Wattage: 1250 Kw
Deployment: Zone


Generator 2
Power Plant: 16 Cylinder 3000 horse power Cummins Marine
Grade Diesel Gen Set:ONAN
Wattage: 1500 Kw
Deployment: Zone


Each Generator is responsible for power in a specific zone of Datacenter 1.


The Power plants are tested weekly. The Generators are load tested monthly. The system is inspected quarterly.
Generator 1
Power Plant: 16 Cylinder 3000 horse power Cummins Marine
Grade Diesel Gen Set:ONAN
Wattage: 2000 Kw
Deployment: Load Sharing


Generator 2
Power Plant: 16 Cylinder 3000 horse power Cummins Marine
Grade Diesel Gen Set:ONAN
Wattage: 2000 Kw
Deployment: Load Sharing


Both Generators handle the all the same load at DC2 with the help of paralleling gear. When a service outage occurs both generators will start for 5 minutes. If the total load is less then 33% of capacity one generator will shutdown. If the load reaches 80% of capacity the other generator will turn on.


The Power plants are tested weekly. The Generators are load tested monthly. The system is inspected quarterly.
Power Switching In the event of a service outage from CenterPoint, the generators will turn over and power will be switch automatically in seconds. This system is tested every month. In the event of a service outage from CenterPoint, the generators will turn over and power will be switch automatically in seconds. This system is tested every month.
UPS Currently there are 5 375 Kw Mitsubishi Currently there are 4 375 Kw Mitsubishi
Cooling Units AC Units: Data Aire 30 Ton
Number of Units: 30
Total tonnage: 900 Tons
Total amps pulled for cooling: 1130 amps
AC Units: Leibert 30 Ton
Number of Units: 17
Total tonnage: 510 Tons
Total amps pulled for cooling: 640 amps